Project Details
The main features of this project is the successful replacement of all 4 aging cooling towers and condenser water piping between the months of January to March. The challenge is to ensure that non of the tenants of this prestigious 33 storey downtown office tower and 2 parkade levels of its food service tenants does not goes without air conditioning services during the entire retro-fit period. With only 2 cooling tower can be offline at any given time and the remaining 2 cooling towers must be operational in order to keep 1 of the 2 chillers operational is the monumental task that the construction team has to ensure that pre fabrication, installation, shut down and tie-in are meticulously planned and transition are smooth as silk. Koodos to Chris Hill, Neal Kelv in and his team. The entire 4 stage switch over operation was a success and the project was completed and turn over to Ledcor & Brookfield Management on schedule.
-
Project Title
Replacement of all 4 aging cooling towers and condenser water piping
-
Client
Royal Centre Tower
-
Category
Mechanical
-
Location
Vancouver, BC